Space SubleasingIndustrial
Industrial and flex space for sublease in Orange County, CA.
Manufacturing, light industrial, flex and R&D units with the power, doors and office already built. Take one over for the time left on the lease, or sublease the part of your plant you don’t use.
Inquiries are free. Every one is read and answered by a person.
Industrial and flex space on a shorter term.
- 01
Power and doors already in
Three-phase power, dock doors and a finished office take months to add. A unit that has them lets you start sooner.
- 02
Room to test a line
A sublease suits a new product, a pilot run or a contract that may not last, because it ends with the master lease.
- 03
Flex space for mixed work
Flex and R&D units mix office with shop or lab space, which suits companies that design, assemble and ship from one address.
What to check.
Industrial units are built for the last tenant’s process. Before you sign, check:
- Power: amps, voltage and phase against what your machines draw at full load.
- Clear height, floor load and column spacing for your equipment.
- Dock-high and grade-level doors, truck access and yard space.
- Zoning and the master lease’s use clause for manufacturing, outdoor storage and hazardous materials.
- Fire sprinklers, ventilation and any air permit your process needs.
Industrial and flex space by city.
- IrvineIrvine Business Complex · Irvine Spectrum
- Costa MesaWestside
- Santa AnaSouth Santa Ana · Near the 55
- AnaheimAnaheim Canyon · North Anaheim
Every other city in Orange County
- Aliso Viejo
- Brea
- Buena Park
- Cypress
- Dana Point
- Fountain Valley
- Fullerton
- Garden Grove
- Huntington Beach
- La Habra
- La Palma
- Laguna Beach
- Laguna Hills
- Laguna Niguel
- Laguna Woods
- Lake Forest
- Los Alamitos
- Mission Viejo
- Orange
- Placentia
- Rancho Santa Margarita
- San Clemente
- San Juan Capistrano
- Seal Beach
- Stanton
- Tustin
- Villa Park
- Westminster
- Yorba Linda
How a sublease works.
Four steps from the tenant’s side. If you are the one looking for space, the same steps happen on your side of the table.
- 1
Check your lease
Find the clause on subletting. It tells you whether the landlord has to consent, what they can ask to see, and any conditions they attached.
- 2
Define the space and the term
Decide how much of the space you can give up, whether furniture, fixtures or equipment stay, and for how long. The sublease has to end on or before the date your own lease does.
- 3
Find and vet the subtenant
Meet the company that wants the space. Check that they can pay. Agree the rent, the deposit, and who covers utilities, parking and repairs.
- 4
Get consent and sign
Send the landlord the proposed subtenant and the draft sublease. Once you have written consent, sign the sublease and hand over the keys.
Tell us what you need.
Pick your side and give us a few details. We reply personally by email or phone. Inquiries are free and there is no obligation.
Industrial subleases: questions.
What is flex space?
A single-story building that mixes office with warehouse, shop or lab space, usually with a grade-level door and a higher share of office than a warehouse. Companies that design, assemble and ship from one place use it.
Can I bring heavy machinery into an industrial sublease?
Only if the floor, the power and the master lease allow it. Check the floor load, the electrical service and whether the landlord’s consent is needed to install equipment or cut into the slab.
Who restores the space when an industrial sublease ends?
The master lease usually requires the tenant to remove its equipment and restore the space, and the sublease passes some of that to the subtenant. Agree in writing what you remove, what stays and who pays to patch the floor and walls.
Do I need permits to run my process in a subleased unit?
Often. Depending on what you make, you may need a business license, a fire permit, an air permit or a hazardous materials plan. Ask the city and the fire authority before you sign.
Do I need my landlord’s permission to sublease?
Usually, yes. Most commercial leases require the landlord’s consent before you sublease. In California, if your lease requires consent but does not say what standard the landlord has to apply, the law reads in a rule that consent may not be unreasonably withheld (Civil Code section 1995.260). Your lease may set its own standard or conditions. Check your own lease carefully and get legal advice before you rely on this.
Am I still responsible for my lease if I sublease?
Yes. The master lease stays in force. You remain responsible to the landlord for the rent and every other obligation in it, even if your subtenant stops paying you. The sublease is a separate agreement between you and the subtenant.
Who will contact me?
Our team reads every inquiry. To help you find or fill space, we may share it with real estate professionals and property owners we work with, who may contact you directly. Space Subleasing itself is a marketing service and doesn’t negotiate leases.
Is there a cost to inquire?
No. Inquiries are free and there is no obligation.