Lab space for sublease in Orange County, CA.

Fume hoods, casework, piped gases and the ventilation to run them are already built. Take over a lab for the time left on someone else’s lease, or sublease the benches your team stopped using.

Inquiries are free. Every one is read and answered by a person.

Why a sublease

Lab space on a shorter term.

  • 01

    Skip the lab build-out

    Ventilation, hoods and gas lines make a new lab one of the costliest spaces to build. A second-generation lab has them.

  • 02

    Bridge to the next raise

    A sublease runs only to the end of the master lease, which suits a startup that needs a lab now and more space after its next round.

  • 03

    Share an underused lab

    If your headcount shrank or a program ended, a subtenant can take the empty benches and cover part of the rent.

Before you sign

What to check.

Labs are permitted for specific work. Before you sign, check:

  • The biosafety level the lab was built and operated at, and the level your work needs.
  • Fume hoods: how many, when they were last certified, and where they exhaust.
  • Which gases are piped in, and who owns the tanks and manifolds.
  • Whether the master lease, zoning and the fire code allow the hazardous materials you use, in the quantities you use them.
  • The decommissioning report from the last occupant, and who does yours when you leave.

Space Subleasing is a listing and inquiry service. We don’t confirm that a space can be used for laboratory work. The subtenant is responsible for checking the permitted use under the master lease, zoning, and every permit and license the business needs before signing.

The process

How a sublease works.

Four steps from the tenant’s side. If you are the one looking for space, the same steps happen on your side of the table.

  1. 1

    Check your lease

    Find the clause on subletting. It tells you whether the landlord has to consent, what they can ask to see, and any conditions they attached.

  2. 2

    Define the space and the term

    Decide how much of the space you can give up, whether furniture, fixtures or equipment stay, and for how long. The sublease has to end on or before the date your own lease does.

  3. 3

    Find and vet the subtenant

    Meet the company that wants the space. Check that they can pay. Agree the rent, the deposit, and who covers utilities, parking and repairs.

  4. 4

    Get consent and sign

    Send the landlord the proposed subtenant and the draft sublease. Once you have written consent, sign the sublease and hand over the keys.

How subleasing works, step by step

Inquiry

Tell us what you need.

Pick your side and give us a few details. We reply personally by email or phone. Inquiries are free and there is no obligation.

I am looking to (required)

Give us an email or a phone number, or both.

Notice at collection. We collect the details above to answer your inquiry and keep a record of it. If you tick the first box, we share your inquiry with partner real estate professionals and property owners, which California law may treat as a sale. Leave it unticked and we will answer you ourselves. See our Privacy Policy for what we collect, how long we keep it and your rights, or use Do Not Sell or Share My Personal Information.

FAQ

Lab subleases: questions.

What does BSL mean on a lab listing?

Biosafety level, from BSL-1 to BSL-4, describes the containment a lab has for work with biological agents. Most commercial labs are BSL-1 or BSL-2. Check the level the space was built for and the level your work requires.

Can I use hazardous materials in a subleased lab?

Only if the master lease allows it and you meet the fire code and environmental rules. In California, a business that stores hazardous materials above set quantities files a Hazardous Materials Business Plan through the state’s reporting system.

Do the fume hoods and equipment come with the lab?

Fume hoods and casework are usually built in and stay. Freezers, biosafety cabinets and instruments usually belong to the departing company. List what stays in the sublease.

What is a lab decommissioning?

Cleaning and documenting a lab when an occupant leaves, so the next one starts without contamination. Ask for the last report before you move in, and agree who decommissions the space when your sublease ends.

Do I need my landlord’s permission to sublease?

Usually, yes. Most commercial leases require the landlord’s consent before you sublease. In California, if your lease requires consent but does not say what standard the landlord has to apply, the law reads in a rule that consent may not be unreasonably withheld (Civil Code section 1995.260). Your lease may set its own standard or conditions. Check your own lease carefully and get legal advice before you rely on this.

Am I still responsible for my lease if I sublease?

Yes. The master lease stays in force. You remain responsible to the landlord for the rent and every other obligation in it, even if your subtenant stops paying you. The sublease is a separate agreement between you and the subtenant.

Who will contact me?

Our team reads every inquiry. To help you find or fill space, we may share it with real estate professionals and property owners we work with, who may contact you directly. Space Subleasing itself is a marketing service and doesn’t negotiate leases.

Is there a cost to inquire?

No. Inquiries are free and there is no obligation.

More questions

Other kinds of space